About The Eysturoy Tunnel:

The Undersea Highway:

On 21.02.2017, Henrik Old, a Faroese cabinet minister, unleashed the first blast in the largest tunnel project ever in the Faroe Islands. This happened in the town of Strendur on Eysturoy. 

Initially a 1.7 km long underwater tunnel was drilled and blasted towards a fixed point under the mouth of the fjord Skálafjørður. 

On 27.04.2017, work began on drilling and blasting a 7.5 km long tunnel from the village of Hvítanes just north of Tórshavn on Streymoy. This tunnel headed towards the same fixed point below Skálafjørður, as the one from Strendur.

An Underwater Roundabout:

On 11.12.2017, the tunnel workers from Strendur reached the fixed point where, an Undersea Roundabout was to be made due to the construction of two tubes southwards from Eysturoy - one from Strendur on the west side of Skálafjørður, the other from Saltnes at Runavík on the east side of the fjord. 

The circular roundabout has a stone pillar artwork in the center. These two new projects involved a team drilling a 2.2 km. long tunnel towards Saltnes, while another team began to drilling towards their mates working on the tunnel from Hvítanes.

A Subsea Meeting:

On 07.06.2019, the drilling teams from Eysturoy and Streymoy met somewhere under the seabed between the two large islands. When the last blast had been shot, an undersea tunnel with three mouths had been constructed. 

The main tunnel is 11,250 meters long (36,909 ft.). In order to increase safety, no incline in the tunnel is steeper than 5%. The highest point of the tunnel is 15.0 meters (49.0 ft) above sea level, while its lowest point is 187.0 meters (614.0 ft) below sea level.

When the work of drilling and blasting was over, work began on building roads in the tunnel and finishing its construction. In parallel with the tunnel project development itself, extensive road construction work has been carried out at the tunnel mouths.

Functions:

Unlike the other two undersea tunnels - the first connecting Vágar with Streymoy and the second connecting Klaksvík on Borðoy with Leirvík on Eysturoy - the Eysturoy tunnel is not meant to replace a ferry route.

Road connections already exist from Tórshavn through a tunnel in Kaldbaksbotnur and then along Streymoy's east coast up to the bridge over the strait to Oyrarbakki on the Eysturoy side. 

From there, the road continues up to the large tunnel leading to the long valley towards the bottom of Skálafjørður. One can drive along the east side of Skálafjørður to the large towns of Skáli and Strendur - or along the west side to Runavík/Saltangará, Toftir and the smaller towns beyond. 

Along the west side one can also turn off at Skipanes and drive up over the mountain pass to Gøta and Fuglafjørður, or turn at Norðragøta to the tunnel leading to Leirvík. 

From there, one can take the undersea tunnel to Klaksvík and the upland areas of the northern islands.

However, the old route is long and difficult in some places, especially in winter and in stormy weather. The function of the Eysturoy tunnel is to make this route redundant for transport and commuters from Eysturoy and Klaksvík.

Shorter Road, Safety and less Emission:

From the tunnel mouths in Runavík and Strendur, there are 55.0 kilometres to Tórshavn along the old route, i.e. ca. 54 minutes’ drive. 

With the new tunnel, the route is only 17.0 kilometres and driving time is 6.00 minutes. The driving distance by road from Tórshavn to Klaksvík is 73.0 kilometres along the old route, approx. 68 minutes’ drive. 

With the new tunnel, the route is 35.0 km and the driving time is shortened to 41.00 minutes. This will improve conditions for commuters and freight transport, both in terms of driving time and road safety. Shorter trips also lead to reduced CO2 emissions, making the Eysturoy tunnel an excellent alternative to older routes.

Underwater Art:

 The tunnel is equipped with a subsea roundabout. In the centre of the Subsea Roundabout, there is a huge basalt column. The Faroese artist Tróndur Patursson when asked to suggest artistic decorations for the column, came up with the solution of painting the "Faroese Chain Dance" on Steel. 

The dancing figures are illuminated from behind with colour-changing light - projecting dancing shadows on the basalt column when car headlights sweep over them

A chorus of one of the long heroic ballads says that "no one dances underground" - but apparently everything is possible under the seabed.

The Underwater Tunnel opened recently on December 19, 2020.

The Stamps:

The two Stamps depicting the Eysturoy Tunnel (10.0 DKK) and the Undersea Roundabout (17.0 DKK).


Two Blocks (set of four stamps) of each Variant.

The First Day Cover (FDC) is titled "EYSTUROYARTUNNILIN" ("Eysturoy Tunnel"). The two Stamps issued in the set are affixed at top right.

The special Cancellation Handstamp/Postmark shows a stylised representation of the Tunnel in the centre. The Cancellation is dated - "19.02.2021" and is of Torshavn Post Office.

A Sheetlet (S) of 20 Stamps of the 17.0 DKK Variant depicting the Undersea Roundabout.
A Sheetlet of 20 Stamps of the 10.0 DKK Variant depicting the Eysturoy Tunnel.

Technical details:

Stamp Set Issue Date: 19.02.2021

Designer: Photos: Pf. Eysturoyartunnilin and Ólavur Frederiksen

Printer: La Poste, France

Process: Offset

Stamp Sizes: 40.0 mm x 26.0 mm

Stamp Values: 10.00 and 17.00 DKK






Links to other Posts on Aland issues:


2) Wildflowers, Aland Islands: A new Series of Franking Labels issued by Aland Post: Date of issue: 03.02.2020
For other interesting posts on issues from the Royal Dutch Mint, Netherlands and PostNL, please visit the following links:


9) "De Haar Castle", Utrecht, Netherlands: The first Coin to be released in the "Dutch Castles" Coin Series: A silver ducat Trade Coin with a history spanning over 350 years, minted by the Royal Dutch Mint: Date/Year of Delivery: 04/2020

10) First Atlases, Netherlands: Commemorating 450 Years of the first Atlas (1570-2020) & others: A Stamp Sheet of six stamps depicting the Atlases which were compiled in the Netherlands in the 16th & 17th Centuries AD: Stamp Set issued by POstNL: Date of Stamp Set issue: 23.03.2020







Dutch Castles Coin Series:


 

5) City of Bruges (or Brugge), Belgium: 20 Years as UNENCO World Heritage Site: A 20 Euro Silver Proof Coin issued by the Royakl Dutch Mint under licencing of the Royal Belgian Mint, on behalf of the National Bank of Belgium: Coin issue date: 26.02.2020

6) 100 Years of Nature & Environment Protection, Luxembourg: Commemorating the Centenary Anniversary of the "Letzebuerger Natur a Vulleschutsliga a.s.b.l. (Luxembourg Nature and Bird Protection Society):A 0.80 Euro Stamp issued by Luxembourg Postes (Post): Date of stamp issue: 10.03.2020

7) Celebrating 25 Years of listing on UNESCO World Heritage Sites, Luxembourg: A Commemorative Stamp of 0.80 Euro issued by Luxembourg Postes (Post): Stamp issue date: 10.03.2020




Some other interesting Posts from Finland, Norway & Nordic Countries:













No comments:

Post a Comment